Older buildings can have undersized pipes, missing plans and roof areas added since the original design. A flood at a driveway may begin with blocked drainage two buildings away.
Map the whole route
Survey roofs, pits, pipes, levels, easements and discharge points. CCTV can show pipe condition, but a separate capacity check shows how much water it can carry.
Match the repair to the cause
- Clear roots and silt.
- Repair broken or misaligned pipes.
- Add pits or overland paths.
- Increase pipes where the full system has capacity.
- Restore or add detention.
- Adjust levels and entry barriers.
Do not just make it faster
Sending water off quickly may overload a neighbour or public drain. Council and engineering requirements may control discharge, detention and treatment.
Work without flooding the site
Plan temporary flow, pumps and an overflow path before removing an old drain. Storm warnings need a clear make safe plan for open trenches.
Stage for access
Keep exits, loading, accessible routes and utilities operating. Trenching across a car park may need steel plates or temporary parking.
Finish with proof
Record levels, pipe size, inspection photos and final tests. Update the drainage plan used by site staff, or the next contractor will start with the wrong map.
Read apartment drainage, pits and trench drains and civil works.
Call 0415 840 500 or request a quote. METCON is a licensed NSW builder (384697C).
Frequently asked questions
Will a bigger pipe solve flooding?
Not if downstream pipes, levels or the public outlet are the restriction.
Who can connect stormwater?
Connections must be made by suitable licensed trades with required approvals.
Can old pipes be relined?
Some can, if shape, condition and remaining capacity suit.