The volume of soil matters, but two basements of the same size can cost very different amounts. Access and support can be bigger items than digging.
The main drivers
- Depth: deeper cuts need more support.
- Rock: hardness and noise limits affect speed.
- Boundaries: neighbouring footings may need underpinning.
- Access: small machines move less.
- Groundwater: pumping and treatment add cost.
- Disposal: soil classification changes where it can go.
Temporary support is not one item
Piles, anchors, props, capping beams, infill and monitoring may be separate packages. Check which are included and how long they remain.
Understand rates
Ask whether rock is paid by measured volume, time or truck. State who measures it and before which machine starts. "Rock extra" without a method invites an argument.
Preparation can save money
A survey, geotechnical report and service search cost money before work, but can avoid a design based on the wrong ground. Test pits also help with old footings.
Questions for bidders
- What volume and levels did you price?
- What support is included?
- What happens if water is found?
- How many loads and what soil type?
- When can the next contractor enter?
Do not choose from the excavation total alone. Add support, drainage, waterproofing and reinstatement. See piled walls, dewatering and basement feasibility.
Call 0415 840 500 or request a quote. METCON is a licensed NSW builder (384697C).
Frequently asked questions
Can I use an average rate?
It may help early thinking, but site conditions make it a weak construction budget.
Is sandstone good or bad for cost?
It may support a face but cost more to cut. The balance is site specific.
Should a contingency be included?
Yes. Size it around known ground, access and neighbour risks.