On a commercial site, retaining walls create usable land for buildings, loading and parking. They also control the order in which other trades can work.
Fix the levels early
Check floor levels, ramps, accessible paths, truck clearance and overland flow together. Raising one car park may make several boundary walls taller.
Choose a wall with the program
Precast, block, gabion, sleeper and reinforced concrete walls have different lead times and access. The cheapest wall on paper may block the site while concrete gains strength.
Coordinate loads
Include delivery trucks, stored goods, buildings, barriers and the crane used during construction. Landscape soil and large trees above add weight too.
Boundary agreements
Footings, anchors and drainage should remain on your land unless there is an agreement. Plan maintenance access before buildings close it off.
Compare bids on the same basis
- Drawings and design responsibility.
- Temporary support.
- Spoil and imported backfill.
- Drainage to the final connection.
- Testing and certificates.
- Fence or barrier fixings.
Protect the new wall
Set when machines can approach and who checks compaction. Excavating for a service trench at the toe can weaken a finished wall.
Handover pack
Include as-built levels, concrete and compaction records, drainage photos, load limits and maintenance. See large concrete walls, commercial gabions and retaining walls.
Call 0415 840 500 or request a quote. METCON is a licensed NSW builder (384697C).
Frequently asked questions
Can walls be built before the building?
Often, if access, drainage and temporary loads are designed.
Who certifies a design and construct wall?
The contract should name design, inspection and certification roles.
Are gabions suitable for commercial work?
They can be, where space, loading, appearance and maintenance suit.