Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Civil

Reinforced Concrete Retaining Walls on Large Sites

24 November 2026 · 4 min read · By the METCON team

A long concrete wall may be designed for soil pressure, a slab above, a building or a vehicle surface. Its joints and construction bays need to follow that job.

Choose a wall shape

Cantilever, counterfort, propped and basement walls support loads differently. The best choice depends on height, available excavation, foundation and permanent floors.

Set bay and joint lines

Joints manage movement and staged pours but can let water through. Waterstops, reinforcement laps and waterproofing must be coordinated before the first bay.

Temporary support comes first

Formwork for a tall wall must resist fresh concrete pressure. Excavated soil, props and scaffolds also need a planned sequence. Removing one prop early can overload another.

Quality checkpoints

  1. Founding ground and levels.
  2. Reinforcement size, location and cover.
  3. Starter bars and waterstops.
  4. Formwork and cast-in items.
  5. Concrete records and curing.
  6. Drainage before backfill.

Plan the top of the wall

Barriers, roads, trees and buildings add loads later. Show where heavy work is prohibited until concrete has gained strength.

Handover

Give as-built drawings, concrete results, water test or drainage records, movement monitoring and permitted loads. Keep the wall behind a building accessible for future cleaning where possible.

See commercial development walls, formwork and engineered retaining walls.

Call 0415 840 500 or request a quote. METCON is a licensed NSW builder (384697C).

Frequently asked questions

Are precast panels the same as in-situ concrete?

They are different systems with different joints, lifting and support requirements.

Can a wall be backfilled after one week?

Only if the specified strength, support and drainage conditions are met.

Do concrete walls need weep holes?

They need suitable drainage, which may use weeps, drains or both.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Civil & Structural
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote