Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Civil

Gabion Walls for Commercial and Larger Civil Projects

24 November 2026 · 4 min read · By the METCON team

Gabions suit larger drainage, embankment and commercial projects where their width can be used. They still need a proper design and good installation.

Start with the plan width

The wall becomes wider towards its base, with extra space for foundation and construction. A road or boundary can be lost quickly if only the front face is drawn.

Choose stone and mesh together

Stone needs suitable size, density, durability and appearance. Mesh opening must contain it. Coating should match expected exposure, particularly near water.

Programme the stone

Ask about supply area, delivery size, storage and who sorts visible stones. Waiting for a small batch of matching rock can hold up the wall.

Build quality to check

  • Base level and approved ground.
  • Geotextile overlaps.
  • Basket joining and bracing.
  • Stone packed with few voids.
  • Straight courses and closed lids.
  • Backfill and drainage by stage.

Protect the edge

Vehicle impact, pedestrians, graffiti and public access may need barriers or a different face. Do not attach a fence to baskets unless the detail has been designed.

Keep it useful later

Plan inspection access and safe vegetation removal. Roots and corrosion can affect joints, but not every plant growing from a gabion is a structural failure.

See gabion dimensions, creek protection and gabion walls.

Call 0415 840 500 or request a quote. METCON is a licensed NSW builder (384697C).

Frequently asked questions

Are gabions always cheaper than concrete?

No. Stone, transport, space, height and finish decide.

Can gabions hold vehicle loads above?

They can be designed to, but load and slope must be checked.

How long do baskets last?

It depends on mesh coating, water, soil, damage and maintenance.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Civil & Structural
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote