Small subdivisions leave little room for error. A drain on the wrong side of a new boundary or a driveway that is too steep can affect every lot.
Begin with constraints
Survey trees, easements, services, flood paths and neighbours. Find out where stormwater and sewer can go before finalising lot lines.
Common civil packages
- Clearing and erosion control.
- Earthworks and retaining walls.
- Stormwater and detention.
- Water, sewer, power and communications.
- Shared driveway or road.
- Kerb, footpath and reinstatement.
Utility work may need authorised providers and separate approvals.
Build in a useful order
- Protect trees and install sediment controls.
- Shape levels and deal with unsuitable ground.
- Lay deep services first.
- Build walls and stormwater.
- Form roads and driveways.
- Test, survey and repair.
Avoid paying twice
Coordinate house driveways and service connections before kerbs are finished. Put conduits under pavement where future work is known.
Inspection and bonds
Council or certifiers may need to see work before it is covered. Ask which tests, surveys and maintenance period apply, and what must happen before a bond is released.
Handover by lot
Provide levels, easements, service locations and wall loads to future builders. See duplex site works, drainage easements and civil works.
Call 0415 840 500 or request a quote. METCON is a licensed NSW builder (384697C).
Frequently asked questions
Can civil works start with DA consent?
Check whether a construction or subdivision works certificate and other conditions are required first.
Who installs sewer and water?
The relevant authority requires approved or licensed providers for its work.
Can lots be sold before civil works end?
Contract and title rules apply. Get property legal advice.