Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Civil

Landslip Repair on Private Property: First Steps and Options

24 November 2026 · 4 min read · By the METCON team

A landslip can involve more than the soil that fell. The sliding surface may run beneath a house, road or retaining wall.

Immediate safety

Keep people out of the area above, below and across the likely path. Call emergency services if people or buildings are at risk. Report damaged utilities and do not drive onto the slope.

Reduce extra water if safe

Redirect downpipes, turn off irrigation and keep runoff away without entering the danger zone. Digging a drain in the wrong place can remove support.

Find out how it moves

A geotechnical engineer may look at slope history, groundwater, boreholes, survey points and nearby structures. One dry surface crack may relate to a much deeper movement.

Possible repair parts

  • Regrading where space allows.
  • Surface and deep drainage.
  • Gabion or reinforced concrete walls.
  • Soil nails, anchors or piles.
  • Soil reinforcement and planting.

The design may use several. A wall built at the toe will not help if the failure surface passes beneath it.

Temporary works

Stabilise the open area, protect people below and plan wet weather access. Machines add load and can trigger more movement.

Boundary and approvals

The stable solution may extend beyond one property. Speak to neighbours early, identify easements and check planning and emergency approvals.

Read slope stabilisation, soil nails and engineered walls.

Call 0415 840 500 or request a quote. METCON is a licensed NSW builder (384697C).

Frequently asked questions

Can I clear the fallen soil?

Not until a geotechnical engineer says it is safe. It may support remaining soil.

Is landslip covered by insurance?

Policy and cause vary. Notify the insurer and ask for a written decision.

How long until repair?

Investigation, approvals, ground movement and access control the timing.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Civil & Structural
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote