These are questions people ask about this problem, with short plain answers. Use them to decide what to ask next, not as a diagnosis of your building.
Will insurance pay for concrete cancer?
Many policies exclude gradual deterioration and building defects, but wording and the cause of resulting damage differ. Ask the insurer to assess the particular claim.
What if a storm made it fall?
A storm may reveal old corrosion. The sudden damage and existing defect can be treated separately. Record both instead of calling the entire repair storm damage.
Should we make the claim before making safe?
People come first. Photograph safely, stop immediate danger, tell the insurer promptly and keep removed material if requested.
What evidence helps?
- Date and weather.
- Photos of damage before removal.
- Previous reports and maintenance.
- Engineer's cause and extent.
- Separate make safe and permanent scopes.
- The policy clause used in a decision.
Can we include upgrades?
Price them separately. New finishes or code work may not be insured with resulting damage, even when done at the same time.
Who lodges a strata claim?
Contact the strata manager and building insurer early. Individual contents or lost rent may involve separate policies.
What if the claim is declined?
Ask for reasons, the clause and expert material in writing. Use the insurer's complaints process and get independent advice where needed.
Read insurance or levy, declined claims and large losses.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
General information only. Confirm current requirements with your certifier, accredited practitioner or lawyer.
Frequently asked questions
Does insurance pay for waterproofing?
It may pay some resulting damage but not the failed membrane. Read the policy.
Can the owners corporation repair first?
Urgent make safe may be needed. Speak with the insurer before permanent work where possible.
Does an engineer decide coverage?
No. They can explain cause; the insurer applies the policy.