Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Commercial

Large Insurance Losses: Managing Structural Building Repairs

24 November 2026 · 4 min read · By the METCON team

Storm, fire and impact losses may involve a builder, insurer, broker, engineer, loss adjuster and business owner. If each keeps a separate defect list, nobody knows which work is approved.

Build one live record

Use numbered areas with photos, damage source, temporary work, quote, approval, variation, completion and responsible person. The building plan should show what is safe to use.

Emergency work first

Make people and property safe, preserve relevant evidence and record what was removed. Do not combine an emergency invoice with a later full-scope repair price.

Scope by system

Structure, roof, facade, services, interiors and contents may have different authorities. A complete price should show demolition, disposal, access, repairs, approvals and reinstatement.

Keep upgrades separate

Owners may choose better materials, a new layout or code-driven upgrades. List those separately so insured repair scope is clear.

Manage the daily decision path

  1. Contractor identifies extra hidden work.
  2. Engineer or assessor reviews if needed.
  3. Price and program effect are issued.
  4. Authorised person accepts or declines.
  5. Work proceeds with photos and records.

Reopening a commercial site

Check structure, exits, power, water, fire systems and the actual access route. A repaired ceiling does not mean a business can safely reopen.

See insurance reports, fire damage and vehicle impact.

Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).

Frequently asked questions

Can a repair start before approval?

Emergency safety can. Seek insurer and contract approval for the permanent scope.

What if the insurer disagrees?

Ask for the clause, reason and any report in writing and seek independent advice.

Should we accept a cash settlement?

Compare the full approved scope, risk and access costs, with legal and insurance advice.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Commercial Construction
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote