A car strike can move masonry, bend steel, crack concrete and damage gas or electrical services. The visible hole may be only the first sign.
Immediate steps
- Call emergency services if needed.
- Keep people away from walls, windows and the floor above.
- Do not move the vehicle if it may be supporting debris.
- Photograph safely before clearing.
- Ask an engineer about occupancy and temporary support.
What to inspect
Follow the impact into columns, beams, lintels, footings and braces. Look for movement at doors and upstairs walls. Glass and facade fixings need checking even if the frame is straight.
Temporary support
Props and weatherproofing should be based on the damaged load path, not a fixed row of acrow props. Public footpaths, live traffic and building entries affect what can be installed.
Repair choices
A bent steel column may need replacement or strengthening. Brickwork may need taking back to undisturbed material. Concrete can need repair, recasting or a larger structural intervention.
Protect the claim record
Keep police and insurer references, photographs, contractor notes and an itemised estimate. Remove unsafe material when directed, but retain useful samples and measurements.
Reopening
Do not rely on the hole being closed. Confirm structure, glazing, services, fire exits and any upper-level restriction before people return.
Related: structural remediation, insurance repairs and make safe.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
Can occupants stay upstairs?
Only after the responsible engineer or authority says it is safe.
Can we reuse a bent steel column?
An engineer must assess movement, cracks and remaining capacity.
Who pays?
Insurance and legal responsibility depend on the facts and policies. Seek advice.