Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Strata

Does Strata Cover Roof Leaks? NSW Q&A

25 November 2026 · 4 min read · By the METCON team

These are questions people ask about this problem, with short plain answers. Use them to decide what to ask next, not as a diagnosis of your building.

Is the roof common property?

It often is, but the strata plan and by-laws decide the boundary. Do not assume that because the stain is in one apartment, that lot owner must repair the roof.

Does strata repair mean insurance will pay?

No. The owners corporation can have a repair duty while the insurer excludes failed waterproofing or gradual wear.

What about the damaged paint inside?

Repairing the roof and repairing lot finishes may have separate decisions. Keep evidence and ask the scheme about its responsibility and any claim.

Can one owner fix it and send a bill?

Do not start common property work without authority except to prevent immediate danger under proper advice. Save records and notify the strata manager urgently.

What if an owner installed air conditioning?

Check its approval and condition. Fixings can damage a roof, but water on the same side is not proof that they did.

Can the repair wait for a meeting?

Make safe and immediate damage may need faster action. Permanent work and funding still need the scheme's proper decision process.

What should an owner send?

Photos, rain time, unit diagram, affected rooms and electrical risk. Ask for the inspection and claim numbers in writing.

Read strata responsibility, roof leaks and leak emergencies.

Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).

General information only. Confirm current requirements with your certifier, accredited practitioner or lawyer.

Frequently asked questions

Does strata insurance cover a worn roof?

Many policies exclude gradual wear. Check the event and wording.

Can an owner withhold levies until the roof is fixed?

Do not assume so. Get legal advice and keep contributions current where required.

Is the top floor always responsible?

No. Common property boundaries and cause matter.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote