A car park must turn vehicles, collect water and separate people from traffic. Counting spaces is only the first step.
Plan the movement
Show entry queues, ramps, reversing, deliveries and pedestrian routes. Check the largest vehicle that will actually use each area. Accessible spaces need suitable paths all the way to the entrance.
Build the right base
Investigate soil, remove soft patches and compact layers as specified. Reusing old asphalt or concrete below may be possible, but buried weak spots reflect through new work.
Make water part of the layout
- Falls that avoid entries.
- Pits outside wheel paths where practical.
- Treatment and detention where required.
- An overflow route if a pit blocks.
- Joints that do not trap water.
Choose the surface by use
Heavy loading bays may need concrete while parking areas use another surface. Turning trucks can damage a surface that works well under cars.
Coordinate what stands above
Lights, bollards, ticket equipment, EV chargers and trees all need footings or conduits. Cutting the pavement after line marking is a common avoidable cost.
Stage an operating site
Keep temporary pedestrian paths, parking signs, lighting and emergency access clear. Test drainage before opening a stage.
Handover
Record pavement areas, pits, compaction, conduits and permitted loads. See traffic decks, industrial hardstands and concrete works.
Call 0415 840 500 or request a quote. METCON is a licensed NSW builder (384697C).
Frequently asked questions
Is concrete or asphalt better?
Compare loads, shutdown time, drainage, upkeep and expected life.
Do EV spaces need extra civil work?
They may need conduits, protection, power and charger footings.
Can the car park stay open?
Often in stages if traffic and pedestrian separation can be maintained.