Class 2 Bathroom Waterproofing: When Is a Regulated Design Needed?

25 November 2026 · 4 min read · By the METCON team

Owners often hear that bathroom waterproofing is exempt. NSW guidance gives a narrower answer: three conditions must all be met before the waterproofing is excluded.

All three conditions

  1. The waterproofing is carried out as a result of alterations to a bathroom, kitchen, laundry or toilet.
  2. The work, including the agreement for it, relates only to a single dwelling.
  3. The work is exempt development.

Missing one can change the answer. A whole-building program is not the same as one owner's bathroom alteration.

Exempt development is not the only test

NSW specifically uses waterproofing as an example of exempt development that is not always excluded from the DBP scheme. Check both pathways instead of stopping when a planning fact sheet says "exempt".

What about a leaking bathroom?

Repairing a common property membrane, several bathrooms or a defect may not match the same exclusion. Ask a registered practitioner before taking the old shower out.

Strata approval is separate

Even where the design scheme does not apply, the owner may need owners corporation approval, by-laws and permission to affect common property. Waterproofing can also be regulated by other building and licensing rules.

Put the scope in writing

  • Why the work is being done.
  • Which dwelling it affects.
  • Whether common property is included.
  • What approvals apply.
  • Who designs, installs and checks it.
  • What documents will be given to strata.

Keep the proof

Retain designs where required, waterproofing records, product information, photos and approvals before final tiles hide the work.

Read bathroom by-laws, CIRDs and waterproofing.

Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).

General information only. Confirm current requirements with your certifier, accredited practitioner or lawyer.

Frequently asked questions

Does every apartment bathroom need a regulated design?

No. Work that meets every condition may be excluded. Confirm current requirements.

Does approval from strata replace a regulated design?

No. They are separate requirements.

Is a waterproofing certificate enough?

It may be useful or required, but it does not decide whether the work needed a regulated design.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Council Approvals
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote