Can Strata Refuse Renovations in NSW? Building Q&A

25 November 2026 · 4 min read · By the METCON team

These are questions people ask about this problem, with short plain answers. Use them to decide what to ask next, not as a diagnosis of your building.

Can strata refuse my renovation?

Some work needs scheme approval and proper conditions. The decision and process depend on the type of work, by-laws, common property and NSW strata law.

Is paint the same as removing a wall?

No. Surface work and structural changes are not treated as the same risk. A wall may hide services, fire parts or support.

What should I include with an application?

  • Clear drawings and finishes.
  • Walls, floors and pipes affected.
  • Waterproofing areas and levels.
  • Acoustic and fire details.
  • Builder and insurance information.
  • Work hours and waste plan.
  • Existing problems recorded.

Why is the slab so important?

Cutting, coring or adding weight can damage reinforcement or post-tension. The owners corporation may need engineering information before it can assess the application.

Can bathroom waterproofing just be replaced?

Check common property, DBP rules and the by-laws. One "exempt" answer may not cover all of them.

What if my neighbour had the same renovation?

Previous approval does not prove identical conditions or that the old work was acceptable. Use it as a question, not a permit.

What if it is refused?

Ask for reasons and current dispute information in writing. A lawyer or suitable strata adviser can explain the next step.

Why spend time on drawings?

They make responsibility, risk and cost clearer before anyone opens a wall. Read bathroom by-laws, floor noise and lot damage.

Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).

General information only. Confirm current requirements with your certifier, accredited practitioner or lawyer.

Frequently asked questions

Can I start while waiting?

Do not start work that may affect common property or require approval.

Can an owners corporation set working hours?

Schemes may set conditions within applicable rules. Check by-laws and council controls.

Does strata approval replace council approval?

No. They are separate.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote