Footsteps, chairs and voices travel differently. An apartment floor that performs well against one may still be noisy for another, especially when the edge touches the building.
Check approval first
Changing carpet to timber or tiles can affect common property and neighbours. Read the by-laws, acoustic requirement and approval conditions before ordering.
Find the existing construction
Concrete thickness, levels, ceiling, old coverings and services affect the result. A product tested elsewhere with a suspended ceiling below may not perform the same on a bare slab.
Build the edge properly
Impact sound can bypass an underlay where:
- Tiles touch a wall.
- A hard skirting bridges the isolation strip.
- Pipes fix the new floor to the slab.
- Adhesive or debris fills the gap.
- Joinery sits directly on one side of the floor.
One bridge can spoil a large room.
Plan finished height
Allow for doors, balcony thresholds, lifts and accessible paths. Grinding a slab to gain a few millimetres may be unsuitable, especially if reinforcement or post-tension is unknown.
Wet areas are different
Do not place a generic acoustic underlay over bathroom waterproofing. The full tile, membrane and acoustic system needs to be compatible.
Test more than the brochure
Compare the complete tested system with this building. Before-and-after site testing can help with an important project, but walls, ceiling and workmanship still influence it.
Keep proof for strata
Retain approval, product and system tests, photos of the edges and completion records.
Read drilling slabs, bathroom by-laws and strata works.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
Will thicker underlay always be quieter?
No. Stiffness, edges, floor, ceiling and complete system matter.
Can the owner below be asked to add a ceiling?
Agreements and responsibilities vary. Do not assume approval or payment.
Can acoustic matting go under a membrane?
Only in a tested and suitable wet-area system.