These are questions people ask about this problem, with short plain answers. Use them to decide what to ask next, not as a diagnosis of your building.
Can concrete cancer actually be fixed?
Often, yes. Loose and affected concrete is removed, rusted steel is treated or replaced as designed, and the section is rebuilt. The source of water or salt must be dealt with too.
Is one patch enough?
Sometimes. A patch suits limited damage in otherwise sound concrete. Repeated patches around the same slab edge can mean the steel or waterproofing problem is larger.
How do you know where to stop cutting?
The visible stain is not the boundary. The repair area is checked by sounding, opening and testing, with engineer limits where the structure is involved.
Does new concrete stop old steel rusting?
Not by itself. Contaminated steel and concrete nearby can continue corroding. The engineer may specify coatings, anodes or other protection.
When is repair not enough?
When too much structural steel has been lost, the member has moved, or the repair would replace most of it. Strengthening or rebuilding may then be compared.
How long should it last?
That depends on salt, water, cover, repair quality and maintenance. Ask for the designed protection and inspection plan, not just a general number of years.
What should I ask for?
Photos before closing, repair map, product records and the cause of the corrosion. Read treatment options, quotes compared and concrete cancer repair.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
Can I paint over concrete cancer?
No. Paint can hide the sign while corrosion continues.
Does every case need an engineer?
Structural, widespread or uncertain damage should be assessed by a suitable engineer.
Can it come back?
Yes, if corrosion remains or water and salt still reach the steel.


