Many apartment buildings with basements rely on pumps to remove stormwater and groundwater. The water collects in a pit, and pumps lift it to the stormwater system. When a pump fails, the car park, storage cages and lift pit can flood within hours in heavy rain.
Why pumps fail
- Float switches stick or are knocked out of position.
- Pumps wear out, or debris and silt jam them.
- Power cuts in storms stop pumps when they are needed most.
- Alarms are not connected or no one responds to them.
- More water arrives than the system was designed for.
The building side of the problem
Pumps are maintained by hydraulic and electrical contractors, and that maintenance matters. But a pump that runs constantly is often a sign that too much water is getting into the basement. That is a building problem:
- Cracks and joints in basement walls and slabs letting groundwater in.
- Failed tanking or drainage behind retaining walls.
- Driveway grates and trench drains that are undersized or blocked.
- Stormwater from podiums or landscaping entering the basement.
- Pit walls and lids with damaged concrete and corroded steel.
How we look at it
We trace where the water is coming from before recommending a fix. That can mean crack injection, repairs to joints, new drainage or tanking. Pit concrete, lids and grates can be repaired at the same time.
What the committee should do now
- Have the pump system serviced and the alarm tested.
- Ask the maintenance contractor how often the pumps are running.
- Check whether the pumps have backup power or a plan for power cuts.
- Inspect after heavy rain for new leaks and water paths.
- Plan repairs to the water entry points before the next wet season.
Read basement car park flooding and lift pit waterproofing, then see waterproofing.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
Who maintains the pumps?
Usually a hydraulic or plumbing contractor engaged by the owners corporation.
Is a flooded basement covered by insurance?
It depends on the cause and the policy. Speak to your strata manager and insurer early.
Can groundwater leaks be stopped from inside?
Often, by injection and internal systems, but the right method depends on the wall and the water pressure.