Rain leaks can come from a roof, balcony, window, facade or plumbing that happens to overflow at the same time. The first job is safety, not choosing paint.
Do this now
- Keep away from wet lights and switches.
- Move belongings and leave the area if the ceiling sags.
- Photograph the stain, drip and weather time.
- Tell the strata manager in writing.
- Ask the unit above what was running.
Do not puncture a ceiling unless a competent person directs it and the electrical risk is controlled.
Questions that find the route
- Does it happen in wind from one direction?
- Does it continue after rain stops?
- Is there a balcony or roof above?
- Does a shower ever make it worse?
- Did the stain move?
- Are other units affected on the same line?
Test in a careful order
Check drains and visible failed edges first, then test one area at a time. A moisture meter shows damp material but not its source.
Why painting too early fails
Damp plaster can stain again and hidden insulation can hold water. Fix the entry point, open affected linings, dry to measured targets and restore fire or acoustic materials where needed.
Who pays?
Roofs, external walls and structural slabs are often common property, but fixtures and alterations can change responsibility. Check the strata plan, by-laws and cause before assuming.
Permanent records
Keep test photos, repaired location, drying readings and waterproofing documents. The next buyer or insurer may ask for them.
Read water from above, roof leaks and water ingress testing.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
Can I turn off the electricity myself?
Only at a safe dry switchboard. Keep clear of wet fittings and call an electrician or emergency service as needed.
Is the unit above always the cause?
No. Water can travel from facade, roof or another unit.
Can I claim rent or loss?
Policies, leases and responsibility vary. Keep records and get advice.