A whole-block renovation may include visible upgrades and repairs that owners would never notice on a brochure. Doing them in the wrong order can mean paying for the same access twice.
Build one building plan
Combine the condition report, owners' wish list, fire requirements, energy work and capital fund. Mark each item as safety, structure, water, compliance, renewal or improvement.
Put hidden work first
- Make dangerous areas safe.
- Stop water through roofs, balconies and facades.
- Repair concrete, steel and masonry.
- Resolve fire and exit issues.
- Replace services that need opened walls.
- Finish lobbies, paint and landscaping.
Find work that shares access
Scaffold can serve windows, concrete, coatings and signs. A bathroom program can share riser access. Car park traffic stages can combine drainage and slab repair.
Make a pilot
Use one balcony stack, corridor or car park zone to test hidden conditions and resident staging. Update quantities before pricing the rest.
Separate optional upgrades
Owners may support essential repairs but disagree about stone, lighting or a new entry. Pricing upgrades separately lets safety work continue.
Give owners three choices
Show a minimum safe program, a planned repair program and a repair-plus-upgrade program. State what each postpones and when access will be needed again.
Finish with a new baseline
Update plans, maintenance and capital works forecasts using what was found. Leaving the pre-renovation plan unchanged wastes the best survey the building has had.
See whole-building programs, shared scaffold and governance.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
Can one builder do the entire project?
A head contractor can coordinate it, with suitable registrations and specialists. Compare scope and capacity.
Must all owners approve?
Approval depends on the work, cost, common property and resolution needed. Get strata advice.
Should common areas be renovated first?
Usually after dusty, wet and structural work to avoid damage.