Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Barangaroo ยท City Fringe Balcony & strata remedial builders in Barangaroo.

Remedial building for Barangaroo apartment towers, hotels and commercial buildings: facades, podiums, terraces, balconies and defect rectification.

  • Free inspection in Barangaroo
  • Itemised written quote
  • Class 2 and strata experience
  • Licensed builder 384697C
  • DBP registered BUP4254812
  • Photos and records for your strata
Talk directly with the builder0415 840 500

Free inspection in Barangaroo

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Inspection in Barangaroo
DBP
Registered for Class 2 work
$20M
Public liability insurance cover
Remedial building in Barangaroo

New towers still need careful diagnosis.

Barangaroo is a modern high-rise precinct with apartments, offices, hotels, restaurants and shared podiums. On newer buildings, warranty periods, design records and original subcontractor details are part of the investigation.

Large glass facades, landscaped terraces and shared basements mean a symptom can cross several ownership areas. Map responsibility and access before opening finishes.

Common problems we fix in Barangaroo

  • Podium and planter membrane leaks
  • Window wall and sealant leaks
  • Balcony threshold and drainage defects
  • Water entry across shared basements
  • Balustrade and facade fixing concerns
Corroded reinforcement exposed for treatment by METCON
BarangarooCity Fringe

Barangaroo at a glance

RegionCity Fringe
CouncilCity of Sydney
Building classClass 2 apartments, strata and homes
InspectionFree, usually within a few days

Barangaroo is largely modern but sits within its own planning framework. Confirm approval, building classification and landowner requirements for each building.

Remedial services in Barangaroo

One builder for the whole problem.

Leaking balconies cause concrete cancer, failed render lets water into walls. We fix the cause and the damage, so you deal with one licensed builder.

Why METCON

Strata remedial work, done once.

We work to your engineer's or consultant's specification, photograph every hold point and hand over the records your strata committee, insurer and future buyers will ask for. For Class 2 buildings we handle the DBP Act requirements with your design practitioner.

You deal directly with the builder, from the first inspection in Barangaroo to the final flood test and handover.

Principal Contractor
Meteora Constructions Pty Ltd
Builder Licence384697C
DBP RegistrationBUP4254812
Demolition LicenceAD214430
Public Liability$20M
ServicingBarangaroo and City Fringe
ABN 89 151 074 421
What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from strata buildings and homeowners.

I couldn't be more pleased that I found Constatine and his team to assist our strata building with landscaping, waterproofing, and concrete cancer repairs. He was knowledgeable, reliable, patient, and deeply committed to achieving the best result for everyone involved. I am 100% confident that the work completed will stand the test of time. He will absolutely be my go-to moving forward, and I have no doubt we will work together again.
JJodi Cremorne
Constatine and his team did an excellent job repairing and waterproofing our garage ceiling and walls, which had been affected by concrete cancer and sandstone erosion. Constatine is highly experienced in remedial works and provided clear advice, transparent costings, and recommended the best products available to ensure a long-lasting result. We highly recommend METCON for specialist remedial works.
JJames Cremorne
My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
SBSteven Brown Vaucluse
Helpful guides

Know more before you start.

Plain-language guides for owners and strata committees.

Barangaroo FAQ

Remedial building in Barangaroo: questions.

Straight answers from the builder. Anything else, just call.

What should a newer Barangaroo building do about defects?

Record them early, get independent evidence and check warranty time limits. Preserve original drawings and manuals before planning permanent repairs.

Do you do balcony repairs and waterproofing in Barangaroo?

Yes. We repair and re-waterproof balconies, terraces, podiums and wet areas on Barangaroo apartment buildings and homes, and repair concrete cancer and balustrades at the same time where needed.

Are you registered for Class 2 apartment work in Barangaroo?

Yes. METCON is a licensed builder (384697C) and a registered building practitioner under the Design and Building Practitioners Act (BUP4254812), so we can carry out remedial work on Class 2 apartment buildings.

Do remedial works in Barangaroo need council approval?

Many repairs are maintenance and do not, but some works can. Barangaroo is largely modern but sits within its own planning framework. Confirm approval, building classification and landowner requirements for each building. The council is City of Sydney. We check what applies before quoting.

How much do remedial repairs cost in Barangaroo?

It depends on what is under the tiles or render, access and the size of the job. We inspect, test where needed and give an itemised quote, with rates for anything hidden.

Nearby areas

Also servicing near Barangaroo.

We work right across City Fringe and the rest of Sydney. See all service areas.

Leaking balcony or concrete cancer in Barangaroo?

Free inspection and a straight answer from a licensed, DBP registered Sydney builder.

Call now Free Quote