These are questions people ask about this problem, with short plain answers. Use them to decide what to ask next, not as a diagnosis of your building.
Is a cracked ceiling normal?
Fine cracks at plaster joints can come from minor movement or finishing. Growth, damp, sagging or steel stains need more attention.
Is it plaster or concrete?
Some apartments have a hung plaster ceiling below concrete. Others expose the painted underside of the slab. Identify the material before filling it.
What do straight lines mean?
Lines may be sheet joints, slab joints or reinforcement. The pattern alone is not enough to choose the cause.
When is it urgent?
- The ceiling sags or sounds loose.
- Concrete is falling.
- Cracks grow quickly.
- Water is near lights.
- Doors or walls move at the same time.
Keep people away and turn off power only where it is safe to do so.
Can noise upstairs cause a crack?
Noise usually does not crack a sound structure, but water, equipment and changed loads may. Do not blame an upstairs owner before investigation.
Why paint and patch fails
Moisture, loose plaster or steel expansion can push the filler out again. Repair the source, support and finish in the correct order.
Who should inspect?
A ceiling specialist may suit a plaster hanger; an engineer may be needed for structure or concrete. Notify the strata manager when common property could be involved.
See ceiling collapse, water from above and roof slab cancer.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
Should I fill it first?
Only a confirmed stable cosmetic crack. Filling can hide movement or damp.
Does a ceiling crack mean the building is moving?
Not always, but record its size, pattern and other changes.
Can I drill through it?
Check the material, services and strata structure first. Do not drill a suspect concrete slab.