Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Residential

Rectifying a New Home With Major Defects

24 November 2026 · 4 min read · By the METCON team

A new home can have dozens of visible items. The bigger question is whether they come from isolated mistakes or the same faulty construction repeated throughout the building.

Make the evidence useful

Group defects by cause and location. Include drawings, the standard or contract requirement, opening records and photos. A long list of paint marks can distract from one waterproofing detail repeated at every door.

Repair, replace or rebuild?

Compare options on the same basis: structural result, damage to sound work, access, remaining risk and cost. A partial rebuild may be more sensible where defective work sits behind most finishes.

Check responsibility before work

Contracts, warranty time limits, insurance and the original builder's access may affect your rights. Obtain legal advice before appointing a replacement builder, except where urgent make safe work is needed.

Plan the new scope

  1. Stop further damage and make dangerous areas safe.
  2. Confirm defective extent with representative openings.
  3. Design corrections, including connected trades.
  4. Price one itemised scope.
  5. Repair in an order that protects finished areas.
  6. Inspect before work is covered.

Do not mix upgrades into rectification

If you also want better joinery or a new layout, price those separately. It keeps evidence clearer and helps owners understand what they are choosing.

Final records

Retain approvals, photos, product data and an updated defect schedule. Mark items closed only after their agreed inspection.

Useful guides: defective building work, defect reports and rectification services.

Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).

Frequently asked questions

Can the original builder return?

They may have rights or offer to. Get legal advice based on your contract and dispute.

Is demolition ever reasonable?

It can be considered where defects are widespread, but needs careful technical and legal evidence.

Can repairs begin before NCAT?

Urgent work may be necessary. Otherwise get advice and preserve evidence first.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Residential Construction
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote