One wall may support a floor, brace another wall and carry the roof at the same time. Removing a few of them can shift load to points that were never meant to take it.

Map the whole load path

Follow load from the roof to the ground, including upstairs walls that do not line up. New beams create larger point loads at their ends. These may need columns and larger footings.

Stability matters too

Walls also stop a house moving sideways. If bracing is removed, steel frames or new bracing may be required even when the vertical load is carried.

Plan the steel delivery

A single long beam may be ideal on paper and impossible to turn through the hallway. Splices, crane access or smaller members can be designed before fabrication.

Propping and sequence

  1. Confirm hidden services and structure.
  2. Build temporary supports on suitable ground.
  3. Prepare columns, pads and connections.
  4. Remove walls in the engineer's order.
  5. Fit and pack steel, then inspect.
  6. Transfer load and remove props gradually.

Protect finishes upstairs

Small movement can crack tiles and plaster. Record the rooms first, set movement limits and allow for repairs. A completely crack-free result should not be promised.

Coordinate ceilings

Air conditioning, drains and electrical cables compete for space around steel. Agree bulkheads and ceiling heights before the beams are ordered.

See load-bearing wall removal, beam replacement and structural works.

Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).

Frequently asked questions

Can beams be hidden in the ceiling?

Sometimes. Depth, joists, services and connections must fit.

Does every beam need a footing?

Every load needs a verified path to the ground. Existing footings may or may not be enough.

Can we keep living upstairs?

It depends on propping, exits, services and the engineer's staging.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Civil & Structural
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote