Corroded or undersized steel beams are common in older homes, terraces, warehouses and apartment buildings. Replacing one is a structural job that needs planning, but with the right team it can be done quickly and safely.
When a beam needs replacing
- Heavy rust, flaking or section loss.
- Cracking in walls or ceilings around the beam.
- Sagging floors or walls above.
- Previous renovations that removed walls without proper support. See load-bearing walls.
See replacing corroded steel beams.

What affects the cost
- Engineering: design, sizing and inspection by a structural engineer.
- Beam size and length: bigger beams need more handling and lifting.
- Temporary propping: supporting the structure while the beam is changed.
- Access: getting a beam into a tight terrace or upper floor.
- Bearings: new piers or padstones where the beam sits.
- Protection: galvanising, paint or fire protection where required.
- Making good: brickwork, plaster, ceilings and floors after the work.
- Services: moving plumbing or electrical in the way.
The process
- Engineer inspects and designs the replacement.
- Install temporary props.
- Remove the old beam carefully.
- Install the new beam on suitable bearings.
- Engineer inspects, where required.
- Remove props and make good.
How long it takes
A straightforward beam replacement can often be done in days, plus time for finishes. Larger or more complex jobs take longer.
How it helps
A new beam restores structural safety, stops cracking and gives a sound base for renovations or sale.
Get a beam replacement quote
We replace corroded and undersized beams with engineers across Sydney. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
How much does it cost to replace a steel beam?
It depends on engineering, beam size, propping, access, bearings, protection and making good. An inspection and engineer's design give an accurate price.
Do I need an engineer to replace a steel beam?
Yes. Structural beams should be designed and inspected by a structural engineer.
Can I stay in my home during beam replacement?
Often, yes, with the work area closed off and safe. It depends on the job.