Many older apartment blocks in the city, eastern suburbs and inner west have lightwells: narrow vertical shafts or internal courtyards between wings that bring light and air into rooms. They are also water traps. Rain falls straight in, leaves and rubbish collect, and the only way out is a small drain at the bottom.
What goes wrong
- Blocked drains. Leaves, rubbish, pigeons and debris block the outlet, and the lightwell fills.
- Undersized or broken pipes. Old drains are cracked, collapsed or too small for heavy storms.
- Poor falls. The floor of the lightwell slopes towards walls or doors rather than the drain.
- No waterproofing. Floors and wall bases were never designed to hold water.
- Damp walls. Constant wetting at the base causes rising damp, salt damage and failing render on the rooms beside it. See rising damp.
- Hard access. Some lightwells can only be reached through a unit or a small window, so they are rarely cleaned.
Signs of trouble
Water through ground floor walls or doors in storms, damp and mould in rooms beside the lightwell, white salt deposits, flaking paint and a musty smell. Upper units may see stains around windows that face the lightwell.
How they are repaired
- Clean out the lightwell and inspect the drains with a camera.
- Repair or replace drainage with adequate capacity, and add an overflow path where possible.
- Correct falls to the drain.
- Waterproof the floor and wall bases.
- Repair damaged render and brickwork, and treat damp in walls.
- Fit guards or mesh to keep debris and birds out.
Maintenance
A lightwell drain needs regular cleaning, especially before storm season. Agree how access will work if the only way in is through a unit. Read stormwater drainage problems in apartment buildings and ground floor apartment damp, then see waterproofing.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
Is the lightwell common property?
Usually yes, but access through a lot can complicate maintenance. Check the strata plan and by-laws.
Can a pump fix a lightwell that floods?
Sometimes, where gravity drainage is impossible. Fixing the drain is usually better.
Why does it only flood in big storms?
Partly blocked or undersized drains cope with light rain but not heavy downpours.


