Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Strata

Green Roof Waterproofing on Apartment Buildings

25 November 2026 · 4 min read · By the METCON team

A green roof combines plants, soil, drainage, membrane and structure. A small membrane repair later may mean moving tonnes of material, so the hidden layers deserve more attention than the planting plan.

Check structure when wet

Saturated soil, mature plants, paving and people are the relevant loads, not the weight of dry materials on delivery day. An engineer should also check where soil will be stored during construction.

Follow the layers

  1. Prepared structure and falls.
  2. Waterproofing suited to the use.
  3. Root resistance or barrier where specified.
  4. Protection.
  5. Drainage layer and filter.
  6. Growing medium and planting.

Each layer must be compatible with the next.

Edges decide the repair cost

Keep outlets and upstands accessible, separate soil from walls and doors, and provide inspection points. Fixings for seats, lights and trellis should never pierce the membrane without a detail.

Test before covering

Complete the inspections and testing that suit the system. Record exact locations and repair any damage again before protection goes down. A rake or planter corner can undo a successful test.

Class 2 considerations

Waterproofing on apartment buildings is generally regulated unless the narrow exclusion applies. Confirm registered design and lodgement requirements early.

Write the maintenance plan

Include outlet cleaning, irrigation leaks, invasive roots, load limits and who may alter planting. Add the cost of eventual membrane access to the long-term plan.

Read podium replacement, planter leaks and waterproofing.

Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).

Frequently asked questions

Can any flat roof become a garden?

No. Loads, drainage, waterproofing, access and approvals must suit.

Does waterproofing stop roots?

Not every membrane does. Root resistance or a separate barrier may be needed.

How do we repair it later?

Plan removable zones and access paths, and keep accurate layer drawings.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote