A roof that leaks in every shower usually has an obvious hole. A roof that leaks only in a storm often has a level, drainage or wind problem.
What heavy rain changes
- Water rises above a low flashing or door sill.
- Outlets cannot drain quickly enough.
- Wind pushes rain sideways and upwards.
- Overflow pipes block or sit too high.
- Ponded water reaches a joint that is normally dry.
Look while it is happening
If it can be done safely from inside or a protected position, photograph water levels and the direction of rain. Never climb onto a wet roof in a storm. Dried tide marks on walls and parapets show the level later.
Check drainage first
Remove leaves and test each outlet into the downpipe, not only at the grate. A clear grate can sit above a crushed or blocked pipe. Confirm that overflows discharge safely when the main outlet fails.
Then check edges
Upstands, door thresholds, parapet caps and wall flashings need enough height and a continuous seal. A membrane can be sound in the middle and leak all the way around the edge.
Fixes that match the cause
- Blockage: clean, repair pipework and improve access.
- Too little capacity: add or enlarge outlets and overflows to a design.
- Low edge: rebuild the junction.
- Ponding: correct falls or drainage points.
- Wind entry: repair flashings and laps.
Before the next storm
Clear outlets, remove loose material, protect electrical equipment and tell occupants what to report.
See box gutter replacement, parapet flashings and storm damage.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
Can a blocked downpipe cause a ceiling leak?
Yes. Backed-up water can rise above the membrane edge or overflow into the building.
Should all ponding be removed?
Investigate any ponding that remains or reaches weak details. Product and design limits differ.
Is storm leakage an insurance claim?
It depends on the cause and policy. Keep photos and weather details.


