A pool is a water-filled structure. On a slope, it may need excavation on one side, fill on another and a retaining wall around both.
Set the pool in three dimensions
Check finished water level, coping, deck, house floor and boundary levels. Moving the pool a little on plan can change the retaining height greatly.
Ask what supports it
The pool shell, retaining walls and excavation can interact. Confirm who designs each part and whether the pool shell holds back soil or needs a separate wall.
Access and spoil
A concrete pump may reach the pool while a small excavator still cannot remove the soil. Measure paths, turning, truck standing and the crane area before booking delivery.
Drain around the pool
- Keep hillside water away.
- Provide a path for deck runoff.
- Relieve water behind walls.
- Protect the house below.
- Check what happens when the pool is empty.
Build safely
Excavate in the engineered order, support the faces and maintain fencing. Unexpected rock or fill may require a design change. Do not backfill a pool before its structure and water conditions allow it.
Combine the trades
Pool shell, drainage, retaining wall, deck and landscaping need one level plan. Independent sketches can meet at the wrong height.
See retaining walls around pools, temporary excavation and engineered walls.
Call 0415 840 500 or request a quote. METCON is a licensed NSW builder (384697C).
Frequently asked questions
Can the pool shell replace a retaining wall?
Only if its design says so and includes the soil and water loads.
Do pools on slopes always need rock excavation?
No. Ground and chosen depth decide, but allowance and testing help.
Can it be excavated before wall approval?
Get site-specific approval and engineering advice. Some combined work needs consent first.