Guests describe all noise as one problem. The building may have traffic through windows, voices through doors, music through slabs and water through pipes. Each needs a different repair.
Find the route
Listen and, where useful, engage an acoustic consultant to measure. Test at the same time guests complain, with doors and air conditioning in their normal state.
Usual weak points
- Gaps below and around room doors.
- Walls stopping at a ceiling.
- Back-to-back power points.
- Bathroom ducts and pipe holes.
- Window seals and thin glazing.
- Floors that carry footsteps.
- Plant fixed directly to structure.
Why extra plasterboard can disappoint
Adding weight to one wall does little if the ceiling above joins the two rooms. Holes behind joinery, a hollow door and an old vent can let sound bypass a well-built lining.
Use refurbishment openings
When bathrooms or ceilings are open, check wall continuity, repair gaps and restore the required fire stopping. Acoustic and fire sealants need systems suitable for both requirements.
Test one pair of rooms
Build the whole junction: wall, door, window, ceiling, pipe holes and floor. Compare before and after, then decide whether to roll it out. One noisy corner room may be unlike the others.
Watch lost space
New linings take area and affect power, furniture and accessible movement. Show the finished dimensions before approving them.
Plan maintenance
Door bottoms, window seals and latch adjustment wear out, so they need regular inspection as well as construction.
Read room checklist, fire upgrades and refurbishment.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
Can a room be made completely soundproof?
Rarely in practice. A suitable target and noise path should be defined.
Will heavy curtains fix traffic noise?
They may reduce echo, but window gaps and glass often matter more.
Does new carpet reduce noise below?
It can help footsteps, but construction and other sounds still need assessment.