Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Strata

Garbage Room Repairs in Apartment Buildings

27 November 2026 · 4 min read · By the METCON team

The garbage room is one of the hardest-working rooms in an apartment building and one of the least maintained. Bins are dragged across the floor, rooms are hosed down, and liquid from rubbish sits on the slab. Over time the floor, walls and drainage fail, and water and smell reach the rooms or car park below.

What goes wrong

  • Failed floor waterproofing. Wash-down water gets through cracked toppings or worn coatings into the slab.
  • Poor falls. Water ponds in corners instead of reaching the drain.
  • Blocked or broken floor wastes. Debris, broken grates and old pipework stop drainage.
  • Damaged concrete. Constant wetting, organic acids and impact from bins wear away the surface and can expose steel.
  • Wall junctions. Water gets in where the floor meets the wall, especially without a coved upstand.
  • Doors and thresholds. Damaged frames and missing seals let water run into corridors.

Signs below the room

White deposits, stains or drips on the car park soffit under the bin room, rusty marks, a bad smell in the basement and wet patches on walls are common clues. See water ingress investigation.

How a proper repair works

  1. Close the room in stages and arrange a temporary bin area.
  2. Remove the failed coatings and damaged concrete.
  3. Repair the slab and any exposed steel.
  4. Correct falls to the floor waste and replace damaged drainage.
  5. Form coved upstands at the walls.
  6. Apply a membrane and a hard-wearing finish suited to wash-down and wheeled bins.
  7. Protect door frames and wall bases from impact.

Keep it working

Regular cleaning of the floor waste, a hose with a trigger rather than a pressure washer on worn surfaces, and wall protection where bins are parked all extend the life of the repair. Some rooms also need better ventilation or fire door repairs, which should be checked by the right specialist.

Read basement car park flooding, then see waterproofing and concrete repairs.

Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).

Frequently asked questions

Can the bin room stay in use during repairs?

Usually the room is closed for a short period with a temporary bin area set up nearby.

Is a painted floor enough?

Paint wears quickly under bins and wash-down. A proper membrane and wearing surface lasts longer.

Who pays for the repair?

The garbage room is usually common property, so it is normally an owners corporation repair.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote