A Development Next Door: Protecting Your Apartment Building

27 November 2026 · 4 min read · By the METCON team

When a basement is dug next to an apartment building, the building can move. Cracked walls, leaking basements and jammed doors are all possible. The owners corporation is not powerless. It has rights, and it should use them before excavation starts.

Get a dilapidation survey

A dilapidation survey records the condition of the building before work starts, with photos of existing cracks, leaks and damage. A second survey after the work shows what changed. The developer often offers one. Make sure it covers common property and any units next to the boundary, and that the owners corporation gets a copy.

Vibration and movement monitoring

Excavation, rock breaking and piling create vibration. Ask what monitoring is planned, what limits apply, and who receives the results. Survey targets on the building can measure movement during excavation.

Rock anchors under your land

Developers often want to install temporary ground anchors that extend under the neighbouring property to hold the shoring wall. They usually need the owner's agreement to do that. For a strata building, that is a decision for the owners corporation. Take legal advice and agree terms, such as insurance, monitoring, de-stressing at the end and costs.

Crane oversail and access

A tower crane jib swinging over your building, or a request to put scaffold or protection on your land, also needs agreement. In NSW, the Access to Neighbouring Land Act 2000 lets a court order access in some cases, so negotiating early is usually better for everyone.

Right of support

NSW law protects land from having its support removed by work on neighbouring land. If damage occurs, the dilapidation surveys become key evidence. See neighbour building work damaged my house.

What to do now

  1. Ask the strata manager to request the developer's construction and excavation plans.
  2. Agree the scope and timing of the dilapidation survey.
  3. Get legal advice before signing any anchor or access deed.
  4. Record new cracks and leaks during the work, with dates.
  5. Have damage assessed by an engineer and repaired properly afterwards.

See our strata remedial and defect rectification pages.

Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).

General information only. Confirm current requirements with your certifier, engineer, strata manager or lawyer.

Frequently asked questions

Do we have to agree to rock anchors?

Generally the developer needs consent to install them under your land. Get legal advice before agreeing.

Who pays for the dilapidation survey?

It is commonly paid for by the developer, but check the terms and make sure you get a copy.

What if cracks appear during excavation?

Record them with photos and dates, tell the strata manager, and raise them with the developer straight away.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote