A roof leak over a gaming room has different operating, power and access risks from a leak over a back store. A club project should start with the rooms and revenue that must be protected.
Map the building by use
Mark kitchens, bars, electrical rooms, offices, gaming, functions, car parks and public bathrooms. Add structural damage and leaks to the same plan. A roof above a main switch can become the first priority.
Keep the members' path safe
- Separate guests, staff and construction.
- Maintain exits and accessible bathrooms.
- Plan food hygiene and dust control.
- Keep security and CCTV working where required.
- Communicate changed parking and events.
Group the work
Close one kitchen or bar only after equipment, services and temporary operation are confirmed. Finish waterproofing and drainage before reinstalling heavy stainless equipment.
Use quiet periods wisely
Early mornings may suit deliveries, but concrete and curing can need more time than a closure offers. Do not promise a Saturday reopening without a contingency.
Common combined projects
Roof membranes, concrete awnings, commercial bathrooms, car park slabs and structural alterations often share access or management. Combine them where it reduces shutdowns, not merely because they are in one report.
Board updates
Report safety, reopening date, approved spending and the next operational risk. See commercial remedial, kitchen waterproofing and change of use.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
Can clubs trade through remediation?
Often in stages, subject to exits, hygiene, noise and the affected areas.
Should we repair only the leaking ceiling?
No. Find the water path and check structure and electrical risk before closing.
How are functions protected?
Publish the access plan early and agree blackout dates in the contract.