An office becoming a gym, a warehouse becoming a showroom or a shop becoming a medical centre may place different demands on the same structure.
Check floor loads first
Books, gym machines, tanks and stored goods can be much heavier than office furniture. The engineer needs real equipment weights and locations, not only a room name. Vibration may control the design even where strength is adequate.
Look for hidden triggers
- New openings for stairs and services.
- Removed walls that braced the building.
- Plant added to a roof.
- Wet rooms over occupied spaces.
- Old fire separation that does not suit the new plan.
Survey before the lease
Review drawings, approvals and previous changes, then inspect critical areas. A cheap space can become expensive if columns, floors or exits cannot support the proposed use.
Split the scope clearly
Separate landlord repairs from tenant work. Existing water ingress, corroded beams and fit-out changes may be discovered at the same time, but they are not necessarily one party's cost.
Work in a useful order
- Check planning and building approvals.
- Investigate structure and services.
- Set upgrades and budget.
- Open and repair the building.
- Complete fit-out after load-bearing work.
A fit-out program should not assume the base building is ready until that has been confirmed.
Read fit-out compliance and structural remediation.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
Does every change of use need structural work?
No. It depends on existing capacity and the new use.
Who pays for upgrades?
The lease and parties' agreement matter. Get commercial legal advice.
Can equipment be spread out to avoid work?
Sometimes, if the engineer verifies loads and the layout can be controlled.