Building Manager Checklist: Spot Remedial Problems Early

4 November 2026 · 4 min read · By the METCON team

Building managers and caretakers see the building every day. That makes them the best early-warning system an owners corporation has. A short, regular walk-around catches leaks, cracking and concrete cancer while repairs are still small.

Roofs and gutters (every quarter and after storms)

  • Leaves and debris in gutters, box gutters and outlets.
  • Ponding on flat roofs after rain.
  • Lifted or cracked flashings and membrane blisters.
  • Overflows working and clear. See box gutter leaks.
Spalled concrete on a soffit, an early warning sign worth reporting.
Spalled concrete on a soffit, an early warning sign worth reporting.

Balconies and terraces

  • Rust stains, cracks or spalling on slab edges and soffits. See signs of concrete cancer.
  • Drips, staining or white deposits under balconies.
  • Loose or rusted balustrades. See balustrade problems.
  • Blocked balcony drains and water pooling.

Facades

  • Cracked or drummy render, and paint peeling.
  • Cracks above windows, a sign of rusted lintels.
  • Failed sealant joints around windows and at expansion joints.

Car parks and basements

  • Water through walls, joints and the ceiling.
  • Rust stains and spalling on columns, beams and soffits.
  • Pumps and pits working; lift pit dry.
  • Worn deck coatings on ramps and driving aisles.

Common areas and inside units

  • Ceiling stains in lobbies and corridors.
  • Resident reports of leaks, mould or damp smells.
  • Cracks in stairwells and walls that are new or growing.

Recording what you find

  1. Photograph each issue with a date and location.
  2. Mark cracks with the date and width so growth can be tracked.
  3. Keep a simple defects register and send it to the strata manager.
  4. Flag safety items, such as loose concrete or balustrades, immediately.

When to call in a specialist

Call a remedial builder or engineer when you see active leaks into units, spalling concrete, rust stains on slabs, cracks wider than a few millimetres, or anything getting worse between walk-arounds. Early inspection is cheap compared with waiting until it fails.

Inspections for building managers

We inspect and report on balconies, waterproofing, concrete and facades for building managers and strata committees. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.

Frequently asked questions

How often should a building manager inspect for remedial issues?

A short walk-around monthly or quarterly, plus checks after major storms, is a sensible routine for most apartment buildings.

What are the early signs of concrete cancer?

Rust stains, fine cracks along the line of reinforcement, and drummy or spalling concrete on slab edges, soffits and columns.

What should be reported immediately?

Loose or falling concrete, loose balustrades, active leaks into units and anything else that is a safety risk.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote