A lift can make upper apartments easier to live in, but few walk-ups were built with space for one. The shaft, landings and footing can be larger parts of the project than the lift car.
Find a feasible location
Check whether a shaft can connect to each landing without blocking exits, windows or parking. An external shaft may meet half landings, which changes whether residents still need to use stairs.
Survey the structure
Openings through walls can remove support or bracing. A new shaft needs a footing and a stable connection to a building that may move differently. The engineer should understand ground conditions before the concept is priced.
Plan approvals and ownership
Owners need advice on resolutions, by-laws, altered common property and future maintenance. Planning, building certification, heritage and Class 2 rules may apply. Do this before ordering equipment.
Separate the budget
- Lift equipment and commissioning.
- Shaft, pit, roof and landings.
- Structural alterations and fire work.
- Power upgrade and telephone line.
- Design, approvals and temporary access.
- Service, inspections and future replacement.
Building while people live there
Stairs may be the only exit, so construction cannot simply close them. Noise, dust, excavation and crane lifts need staging. Ask how residents with mobility needs will be supported throughout.
Test the idea cheaply first
A measured concept and engineer's review can reveal a fatal problem before full design fees. See small strata schemes and slab openings.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
Will a lift serve every apartment?
It depends on where landings meet units. Half-level stairs can be a major constraint.
Can only upper owners pay?
Cost sharing depends on strata law and by-laws. Get legal advice.
Does a lift need a pit?
Many do. Some systems use a shallow pit, but site and code requirements still apply.