A small broken joint becomes a wheel trap when forklifts hit it all day. The same repair used in a quiet storeroom may fail in a main aisle within weeks.
Survey the traffic
Map main routes, turning zones, dock doors and racking. Record forklift type, wheel, load and speed. Repeated impact at one edge points to a different repair from a single shrinkage crack.
Check structure too
Broken slab edges may come from loss of support underneath. Sound the slab and look for settlement, voids or drainage before filling the surface.
Repair choices
- Cut and fill damaged joint edges.
- Replace a full panel or thickened area.
- Dowel or stitch where designed.
- Level shallow areas with a suitable mortar.
- Rebuild a localised structural section.
Night shutdowns are not magic
Drying, strength and floor temperature still control when traffic can return. Choose materials against the actual handover time, then keep a contingency route.
Racking needs coordination
Posts may need unloading or moving. Do not break around a fixing unless the racking and slab engineer have agreed the support.
Handover checks
Measure level, hardness and profile where required. Walk routes with facility staff, test turning and repair any sharp edge before the normal shift.
See industrial structural repairs, concrete repairs and commercial maintenance.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
Can we use fast-setting mortar everywhere?
No. Movement, thickness, temperature and load affect the choice.
How soon can forklifts drive?
Only after the specified strength and cure are reached.
Does slab damage mean subsidence?
It can be joint impact, drying, poor support or overload. Assess the cause.