A pub may contain a cellar, bar, kitchen, gaming room, offices and upstairs accommodation, all built in different decades. Removing one wall to open the bar can affect several of them.
Find old alterations
Old plans may show an internal wall that has already been replaced by steel. Others may omit a beam hidden in a ceiling. Open key points and trace loads to the footing before the demolition drawing is final.
Check these areas
- Floors above bars and kitchens.
- Cellar walls, damp and drainage.
- Street awnings and their connections.
- Timber roofs and parapets.
- Chimneys and unused fireplaces.
- External stairs and balconies.
Kitchens bring weight and water
New cool rooms, exhaust and cooking lines add load and openings. Floors need falls, waterproofing and service access. Locate drains before fixing the equipment plan.
Plan for heritage
Original fabric can affect demolition, windows, tiles and facade work. Confirm what is protected early, then design openings around it rather than asking for approval after steel is ordered.
Protect trading areas
Build dustproof, fire-suitable separation where required and keep public routes clear. A temporary bar can help, but services and licensing need checking.
Use opened walls
When finishes are off, repair leaking roofs, corroded steel and damp masonry. Covering them to meet an opening night usually means closing again.
A useful order
Investigate, make safe, design steel, build temporary support, strip out, repair structure, then fit out.
Read heritage pub restoration, street awnings and structural remediation.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
Can a wall between bars come out?
Only after an engineer confirms what it supports and designs replacement support.
Can upstairs rooms stay occupied?
It depends on temporary support, exits, noise and services.
Do old pubs always have heritage controls?
No, but many do. Check local and state listings and conservation areas.


