Office owners often wait until a tenant reports a leak or a piece of concrete falls. By then, several levels may need access and temporary protection.
Inspect by exposure
Coastal sides, parapets, plant levels and window joints can age at different rates. Inspect close up in representative areas and mark each defect on an elevation.
Separate three kinds of work
- Safety and structural repairs.
- Waterproofing and sealants.
- Cleaning, coatings and presentation.
Doing the third before the first two wastes money. Combining all three under shared access can still be good value.
Think like a tenant
Where will people enter? Can meeting rooms tolerate concrete breaking? Who moves desks near leaking windows? Publish access and noise dates early enough for tenants to plan.
Get a measured contract
Use repair types and rates where concealed quantities are uncertain. Include photos and approval before extra work, or committees and asset managers end up arguing over invoices months later.
Plan signage and services
Signs, lights and cables can trap water and cover concrete. Agree who removes, stores and refixes them. Seal new penetrations instead of returning old hardware through fresh work.
Next ten years
Use repair findings to plan joints, coatings and roof renewal. Scaffold once is better than scaffold for an avoidable leak the following year.
See commercial remedial, tenant leak complaints and facade repairs.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
Can office concrete repairs happen at night?
Some can, subject to noise limits, approvals and lighting. Daytime may be safer for some tasks.
Do we need all facade access?
Not always. Access should match the mapped defects and inspection needs.
Can tenants fund the work?
The lease decides recoveries. Get property and legal advice.