Owners are often surprised to learn that the balcony they think of as theirs is partly common property. It matters because the owners corporation must maintain and repair common property, while the lot owner looks after their own lot.
Where the lot ends
For most strata plans registered since July 1974, the boundaries of a lot are set by the inner surfaces of the walls, floor and ceiling shown on the plan, unless the plan says otherwise. Anything outside those surfaces, such as the structural slab and the outside of the walls, is usually common property.
Typical answers for a balcony
- The concrete slab. Usually common property.
- The waterproofing membrane. Usually common property, as it sits on or in the slab.
- Original tiles. Often treated as common property, but this depends on the plan and on any by-laws. Tiles an owner added later can be a different question.
- Balustrades and handrails. Often common property, especially where they form part of the outside of the building.
- The sliding door. Depends on the plan. Windows and doors in boundary walls are often common property in older plans.
- Drain outlets and pipes. Usually common property.
By-laws can change the answer
A common property rights by-law can give an owner exclusive use of part of the common property and make them responsible for maintaining it. Some buildings have by-laws that move balcony tile or door maintenance to owners. Read common property rights by-laws and repairs.
Why it matters for concrete cancer
If water through a failed common property membrane has caused concrete cancer in the slab, the owners corporation will usually be the one to repair it. If an owner damaged the membrane during their own renovation, the position can change. See concrete cancer on balconies: who pays.
How to find out for your building
- Get the strata plan and check the lot boundaries.
- Read the by-laws, including any registered later.
- Ask the strata manager how the scheme has handled balcony repairs before.
- Get legal advice where the answer affects who pays for a large repair.
Then look at balcony repairs and strata remedial works.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
General information only. Confirm current requirements with your certifier, engineer, strata manager or lawyer.
Frequently asked questions
Can I replace my balcony tiles without approval?
Often not. If tiles are common property or the work affects the membrane, you usually need owners corporation approval.
Who pays if my balcony leaks into the unit below?
It depends on the cause and who owns the failed part. A membrane failure is often an owners corporation repair.
Where do I get the strata plan?
From your strata manager, or by searching NSW Land Registry Services.


