Water can drop several levels before a guest reports it. A wet carpet may come from a bathroom above, an air-conditioning tray, a window or a pipe in the wall.
The first hour
- Keep guests away from wet electrical areas and sagging ceilings.
- Isolate the source if it can be done safely.
- Check rooms above, below and beside.
- Protect lifts, electrical rooms and evidence.
- Photograph marks before drying equipment moves.
Map the stack
Record shower use, rain, air-conditioning operation and pipe pressure. Test one possible source at a time. Running several showers at once may prove water leaks, but not which bathroom caused it.
Open with a purpose
Cut inspection holes at likely low points and check framing, insulation and fire-rated linings. Wet material behind a dry surface can produce odour and mould later.
Dry to a measurement
Keep room-by-room readings and compare with suitable dry areas. Fans without humidity control can spread moisture and dust. Do not close a wall because the paint feels dry.
Repair the cause
Replacing one shower tile will not help if the membrane is failed. Replacing a membrane will not help if the pipe leaks. Confirm the cause, then agree a trial repair.
Reopen one complete room
- Source fixed.
- Structure and cavity dry.
- Fire and acoustic linings restored.
- Plumbing or waterproofing tested.
- Finishes complete and cleaned.
Keep insurance records
Separate emergency costs, resulting damage and improvements. See bathroom leaks, insurance losses and waterproofing.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
How long should walls dry?
Until measured conditions meet the agreed target. Material, humidity and airflow affect time.
Can we replace carpet straight away?
Not until the slab, underlay and source have been checked.
Can a ceiling leak be caused two floors up?
Yes. Water can travel along slabs, pipes and framing.