Hotel bedrooms already have bathrooms, so conversion seems straightforward. The difficult work is often between rooms: fire, sound, ventilation, meters and shared services.
Check the change of use
Apartments may change the building classification and approval path. Planning controls, parking, private open space and existing consent can decide the project before construction cost does.
Test the room layout
- Can kitchens be exhausted safely?
- Do bedrooms have suitable light and air?
- Can walls meet acoustic requirements?
- Where will laundries drain?
- Are entries, stairs and lifts suitable?
Combining two rooms can solve one problem and place a new opening through a structural wall.
Investigate hidden services
Hotels may have shared hot water, one meter and limited isolation. Individual apartments can need separate shut-offs, meters and access. Old risers may not have space for them.
Do not inherit water leaks
Test bathrooms, balconies, roofs and facades before conversion. A developer who sells apartments with old defects faces a very different group of owners and obligations.
Structure and openings
New stairs, shafts and combined rooms need an engineer. Post-tensioned floors must be found before drilling. Added kitchens, partitions and plant also change load.
Build one pilot apartment
Open it fully, run the new services, test acoustic details and photograph the concealed construction. A pilot will expose conflicts that a room survey misses.
Plan registrations and records
Confirm how building and design practitioner rules apply to the new class. Read Class 3 buildings, building conversions and Class 2 works.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
General information only. Confirm current requirements with your certifier, accredited practitioner or lawyer.
Frequently asked questions
Does a hotel become Class 2 after conversion?
It may, depending on the dwellings and approved use. A certifier must confirm.
Can old bathrooms stay?
Only if layout, waterproofing, services and compliance suit the new use.
Is every hotel suitable?
No. Planning, floor layout, light, structure or services can make conversion unrealistic.


