Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Strata

Remedial Works for Townhouse and Villa Complexes

23 November 2026 · 4 min read · By the METCON team

Townhouse and villa complexes are a big part of Sydney's strata housing. They have different problems from apartment towers: more roofs, more ground-level drainage, long shared driveways and retaining walls, and boundaries between lot and common property that vary a lot between schemes.

Common problems

  • Roofs. Tired tiles, valleys and flashings, and box gutters between attached dwellings.
  • Retaining walls. Timber sleeper walls past their life, and leaning masonry walls. See retaining wall repairs in strata.
  • Driveways and paths. Cracked concrete, trip hazards and failed drainage grates.
  • Stormwater. Courtyards and garages flooding, blocked pits and undersized pipes.
  • Brickwork. Cracking from clay movement, tree roots and failed wall ties.
  • Damp. Ground floor walls with rising damp or water against walls from high garden beds.

Who is responsible

Townhouse complexes may be standard strata, or community or neighbourhood schemes, and some have by-laws that make owners responsible for parts of their own dwelling. The strata plan and by-laws decide what is common property. Always check before work. See who is responsible for repairs.

Plan across the complex

Because the dwellings were usually built at the same time with the same materials, problems tend to appear across the whole complex. Inspecting and scoping all of them together, and staging the work, is usually cheaper than fixing one at a time.

Townhouse complex repairs

We repair roofs, retaining walls, driveways, drainage and brickwork in townhouse and villa complexes across Sydney. See strata remedial works. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.

Frequently asked questions

Is my townhouse roof common property?

It depends on your strata plan and by-laws. In many schemes it is common property, but some by-laws transfer responsibility to owners.

Do townhouse complexes need DBP registered builders?

The DBP scheme applies to Class 2 buildings. Many townhouse complexes are Class 1 dwellings. Your strata manager or certifier can confirm the classification.

Can we fix retaining walls in stages?

Yes, if the engineer agrees. Start with walls that are leaning or near paths and driveways.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote