Once remedial works start, the committee and strata manager need to know what is happening without visiting site every day. Good progress reports do that. They also create the records that protect the scheme later.
What a weekly report should include
- Progress: what was done this week, by area or stack.
- Photos: before, during and after, labelled by location.
- Hold points: inspections by the engineer or consultant, and results.
- Program: whether the job is on time, and any changes.
- Variations: new items found, with cost and approval status.
- Resident issues: complaints, access problems and how they were resolved.
- Next week: what is planned and which residents are affected.

Why photos at hold points matter
Once tiles go back down, nobody can see the membrane, the repaired steel or the drains. Photos at each stage are the only proof that the work was done correctly. See how a balcony is waterproofed and concrete repairs.
Managing variations
- Variations should be described, photographed and priced before work proceeds, except in emergencies.
- Use the rates agreed in the contract where possible.
- Keep a running total against the approved contingency.
The handover pack
At the end of the job, the scheme should receive:
- Final photos and a summary of work completed.
- Flood test records. See waterproofing certificates.
- Product data and warranties.
- Certificates and compliance documents, including DBP documents for Class 2 work where required.
- Maintenance advice, such as drain cleaning and sealant checks.
Where records end up
Store everything with the strata records. Buyers and their advisers increasingly ask about remedial history. See checking strata records.
How good reporting helps
Committees spend less time chasing, owners trust the process and the scheme has evidence if a defect appears later.
Clear reporting on every job
We provide regular updates and a complete handover pack on our strata projects. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
How often should a remedial builder report to the strata committee?
Weekly is common for active projects, with urgent issues reported straight away.
What records should we receive at the end of remedial works?
Photos, flood tests, product warranties, certificates and compliance documents, and maintenance advice.
Why do photos of waterproofing matter?
Once finishes are installed, the membrane and repairs cannot be seen. Photos are the record that the work was done correctly.