Most hotel checklists cover lights, locks and minibars. The expensive failures usually begin outside the room: a blocked outlet, a split joint or a balcony fixing that has rusted for years.
Every month
- Look for new ceiling stains, peeling paint and musty rooms.
- Check plant rooms for leaks and blocked drains.
- Walk the car park for cracks, rust stains and drips.
- Confirm exits and fire doors have not been altered.
Before and after storms
- Clear roof outlets, box gutters and overflows.
- Check parapets, flashings and loose sheeting.
- Test basement pumps and alarms.
- Photograph leaks while they are active.
Every quarter
- Inspect shower grout, silicone and floor wastes by riser.
- Check balcony drains, balustrades and slab edges.
- Look around windows for failed sealant.
- Inspect pool surrounds and the ceiling beneath.
Every year
- Walk the roof and facade with a building professional.
- Review repeated complaints by room stack.
- Update the repair forecast.
- Check warranties and the maintenance they require.
Fire safety measures have their own servicing and certification rules, so they need a separate schedule.
Log location, not just room
A leak in 412 and a stain in 312 may be one failed riser. Record stack, wall, weather and time. Patterns then appear without any special software.
Escalate quickly
Falling concrete, loose balustrades, sagging ceilings and water near electrical equipment should be isolated immediately.
Read planned maintenance, capex planning and commercial remedial.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
Who should do the checks?
Trained staff can note visible changes. Roofs, structure and fire systems need suitably qualified people.
How often should facades be inspected?
It depends on age, exposure, materials and previous defects.
Is a spreadsheet enough?
Yes, if it records location, date, photo, action and close-out consistently.


