Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Remedial

Concrete Cancer in Strata Swimming Pools and Pool Surrounds

23 November 2026 · 4 min read · By the METCON team

Many Sydney apartment complexes have a pool, often built on a podium above the car park. Pools are full of water and chemicals by design, so when something fails, the concrete around them can suffer badly.

Where the damage shows

  • Rust stains, cracking and dripping on the car park ceiling under the pool or pool deck.
  • Calcium stalactites hanging from slabs below.
  • Drummy or lifting tiles around the pool edge.
  • Cracks or spalling in the pool shell, coping or balance tank.
  • The pool losing more water than evaporation explains.

Common causes

  • Leaking pool shells or failed shell waterproofing.
  • Failed membranes under the pool deck tiles.
  • Leaking pipework, skimmers and returns.
  • Splash and backwash water from chlorinated or salt pools soaking into concrete.
  • Poor drainage of the deck towards the building.

See pool deck leaks.

Investigation

Leak detection specialists can pressure test pipework and dye test the shell. The remedial engineer inspects the slab and car park soffit, and testing for chlorides shows how far contamination has spread. It is important to work out whether water is coming from the pool itself, the deck, or both.

Repair approach

  1. Make the car park below safe, removing loose concrete.
  2. Fix the water source: pool shell, plumbing, or deck membrane.
  3. Repair concrete cancer to the soffit and pool structure.
  4. Consider corrosion protection where chloride levels are high.
  5. Reinstate tiling, coping and drainage.

Plan around the season

Pool works mean closing the pool. Most owners corporations prefer the cooler months. Plan early so investigations and approvals are done in time.

Pool area remediation

We repair concrete and waterproofing around strata pools and the car parks below them, coordinating pool specialists where needed. See concrete cancer repair. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.

Frequently asked questions

Is a leaking strata pool common property?

In most schemes the pool is common property, so the owners corporation is responsible. Check the strata plan.

Can the pool stay open during repairs?

Usually not for deck or shell repairs. Car park soffit repairs can sometimes happen with the pool open.

Does salt water make concrete cancer worse?

Salt water adds chlorides, which accelerate corrosion of the steel. Good waterproofing and drainage matter even more.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Structural Remediation
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote