Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Remedial

What Is Remedial Construction? Remedial Building Work Explained

6 October 2026 · 4 min read · By the METCON team

Remedial construction, also called remedial building work or building remediation, is the repair of defects and deterioration in existing buildings. It is a specialised field: the work is done on occupied buildings, old materials and past repairs, and the visible damage is rarely where the problem started.

Remedial construction vs renovation

A renovation changes a building: new kitchens, layouts and finishes. Remedial construction fixes what has gone wrong with it: water getting in, steel corroding, concrete spalling, masonry failing. The goal is to restore the building's structure and weatherproofing, not just its appearance.

Remedial work on occupied buildings needs safe access and staging.
Remedial work on occupied buildings needs safe access and staging.

Common types of remedial building work

How remedial work is done

  1. Investigation to find the cause, not just the symptom.
  2. Scope and specification, often by a remedial or structural engineer.
  3. Pricing against the scope, ideally itemised.
  4. Remediation, with hold point inspections at critical stages.
  5. Documentation: photos, product data and sign-offs.

Regulation in NSW

Residential remedial work must be done by an appropriately licensed builder. For Class 2 apartment buildings, remedial work is regulated building work under the Design and Building Practitioners Act 2020, and the builder must be registered. METCON holds DBP General Unrestricted registration (BUP4254812).

Choosing a remedial builder

Look for experience with the specific defect, engineer coordination, DBP registration for apartment work, and itemised, documented scopes. Our guide What does a remedial builder do? covers this in more depth.

See our remedial building services.

Frequently asked questions

What does remedial building work include?

Repairs to defects and deterioration in existing buildings, such as concrete cancer, leaking balconies, waterproofing failures, brickwork and facade damage, structural corrosion and defect rectification.

Is remedial work covered by home warranty insurance?

Residential remedial work in NSW carries statutory warranties under the Home Building Act 1989, and HBCF insurance applies to residential work over the threshold where required.

Do apartment buildings need a DBP registered builder?

For Class 2 buildings in NSW, remedial work is regulated under the Design and Building Practitioners Act 2020 and must be done by a registered building practitioner.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Structural Remediation
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote