Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Strata

Keeping Residents Safe During Remedial Works

23 November 2026 · 4 min read · By the METCON team

Unlike a new building site, remedial works happen in a building full of residents, children, pets, visitors and delivery drivers. Safety planning has to cover all of them, not just the workers.

Separating people from the work

  • Hoardings and fencing around work areas at ground level.
  • Overhead protection such as gantries or covered walkways over entries where work is above.
  • Exclusion zones below swing stages and rope access work.
  • Signage showing closed areas and alternative routes.

Keeping entries and exits open

Fire exits, paths to the street and accessible routes must stay available. Where an entry must close, an alternative is arranged and residents are told in advance.

Scaffold security

Scaffold next to balconies and windows can be a security risk. Good practice includes locking or removing ladder access after hours, alarms or sensors where appropriate, and reminding residents to lock windows and balcony doors.

Noise, dust and hazardous materials

  • Noisy works in agreed hours with notice. See working hours and noise.
  • Dust control during concrete cutting and grinding, including silica dust controls for workers and residents.
  • Testing for asbestos before disturbing older materials.

Communication

Regular notices in lifts and letterboxes, a contact number for the site supervisor and quick responses to concerns. Residents who know what is happening are safer and calmer. See living in a building during remedial works.

Safe remedial works

We plan every strata project around the people who live there, with hoardings, protection and clear communication. See strata remedial works. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.

Frequently asked questions

Can residents walk under scaffold?

Only where the scaffold has proper overhead protection and the route is designated as safe.

What happens to my car space during works?

Some car spaces may be needed for access or storage for periods. Good builders give notice and stage this.

Who do I contact about a safety concern?

The site supervisor first, then the strata manager. Contact details should be on the notices.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote