When balconies leak or crack, committees often aren't sure who to call first. Each professional has a different role, and larger jobs usually need more than one.
Remedial engineer or consultant
- Investigates and tests.
- Designs the repair and writes the specification.
- Inspects hold points and certifies work.
- Prepares regulated designs on Class 2 buildings where required.
See remedial engineering explained.

Waterproofer
- Installs membranes, a licensed trade in NSW.
- Often a subcontractor to the builder on larger jobs.
Remedial builder
- Coordinates the whole job: demolition, concrete repairs, waterproofing, tiling, balustrades and finishes.
- Manages access, safety, residents and records.
- Registered building practitioner for Class 2 work where required.
See what a remedial builder does.
Which approach?
| Situation | Usually best |
|---|---|
| One simple leak or drain | Remedial builder inspection and repair |
| Several balconies, concrete damage | Engineer-led specification, builder delivers |
| Structural concerns | Structural engineer first |
| New building defects | Independent report, then rectification |
See engineer-led vs design and construct.
Why one builder helps
Balconies involve concrete, membranes, tiles, metalwork and finishes. One builder coordinating it all avoids gaps where trades blame each other.
How the right team helps
The right mix gets the diagnosis right, the work done properly and the records your building needs.
Talk to a remedial builder
We inspect balconies, work with your engineer and deliver the full repair. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Should I call an engineer or a builder for a leaking balcony?
For a single, simple leak, a remedial builder can usually inspect and fix it. Larger or structural problems benefit from an engineer first.
Do waterproofers need a licence in NSW?
Yes. Waterproofing is a licensed trade in NSW.
Can a builder handle the whole balcony repair?
Yes. A remedial builder can coordinate demolition, concrete, waterproofing, tiling and balustrades, working to an engineer's design where needed.


