Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Reports

Neighbour's Tree Damaging Your Property? Reports and Evidence

20 November 2026 · 4 min read · By the METCON team

Tree roots can crack footings, lift paving, damage retaining walls and break drains. When the tree is on the neighbour's land, the first step is a conversation. If that does not work, NSW has a specific law for tree disputes between neighbours.

The law in brief

The Trees (Disputes Between Neighbours) Act 2006 lets an owner apply to the Land and Environment Court about a tree on adjoining land that has caused, is causing or is likely to cause damage to their property, or is likely to injure someone. The court can make orders such as root pruning, barriers, removal or compensation. Get legal advice before applying, and check council rules about the tree first.

What you need to show

  • The tree is on adjoining land.
  • The damage, with photos, dates and measurements.
  • That the tree caused, or is likely to cause, the damage.
  • What it will cost to repair.

Who gives the evidence

QuestionUsually answered by
Is the tree causing it? Roots, species, healthAn arborist
What is damaged, and how badly?A builder or engineer
How is it repaired, and what does it cost?A builder, with a fixed-price quote

Common tree damage

  • Cracked brick walls and footings, especially on reactive clay. See tree roots and foundations.
  • Lifted paths, driveways and paving.
  • Leaning boundary and retaining walls.
  • Blocked or broken stormwater and sewer pipes.

Record it early

Crack monitoring over time, with dated photos and measurements, shows whether damage is getting worse. That is strong evidence.

Reports and repair quotes

We report on the building damage, work alongside your arborist and price the repairs. See defect reports and fixed-price repair quotes. The fee is fixed and agreed in writing before the inspection, so you know the cost of the report before you commit. METCON is a licensed builder (384697C) and DBP registered (BUP4254812), and we fix building defects for a living. Call 0415 840 500 or request a report or quote. We confirm a fixed fee in writing before we start.

This article is general information, not legal advice. For your situation, speak to a lawyer, NSW Fair Trading or the Tribunal.

Frequently asked questions

Can I cut roots that cross the boundary?

Council tree rules may restrict it, and cutting major roots can harm the tree. Check with council and an arborist first.

Does home insurance cover tree root damage?

Many policies exclude gradual damage from roots. Check your policy.

Do I need an arborist and a builder?

Usually yes. The arborist links the damage to the tree; the builder scopes and costs the repair.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Inspections & Reports
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Need a report for NCAT, court or insurance?

Fixed fee agreed before we start. Clear findings, an itemised scope and a fixed-price rectification quote.

Call now Request Report