Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Retaining Walls ยท Sutherland Shire Waterfront slopes and sandstone ridges. Sorted.

From Cronulla and Caringbah to Menai and Engadine, the Shire has steep waterfront blocks, sandstone ridges and sandy coastal soils. We build retaining walls that suit them and handle the approvals.

  • Sutherland Shire retaining walls
  • Waterfront & sloping blocks
  • Sandstone & concrete sleeper
  • Gabion & engineered walls
  • Council approvals handled
  • Free site assessment
Talk directly with the builder0415 840 500

Free Sutherland Shire wall quote

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
Building in the Shire

Every street is different.

The Sutherland Shire ranges from sandy coastal soils around Cronulla and Kurnell to sandstone ridges and steep waterfront blocks along the Georges and Port Hacking rivers. A wall that works in one suburb may not suit the next.

Waterfront and bushland sites can bring extra rules, such as foreshore setbacks, bushfire requirements and tree protection. Rock close to the surface can make excavation slower but gives excellent footings when handled properly.

Sutherland Shire Council sets the controls for retaining walls, including when a wall is exempt and when it needs approval. We check the rules for your property and look after the paperwork.

Natural sandstone retaining wall
ShireSutherland Shire
Is this you?

Common Sutherland Shire wall jobs

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

Waterfront terracing

Turning steep waterfront slopes into level, usable terraces down to the water.

Sandstone feature walls

Natural sandstone walls that suit the Shire's sandstone landscape.

Pool and deck retaining

Walls that support pools, decks and entertaining areas on sloping blocks.

Driveway walls

Engineered walls along steep driveways and garages.

Replacing timber walls

Old treated pine walls replaced with longer-lasting sleeper, block or stone.

Repairs after heavy rain

Leaning and failing walls rebuilt with proper drainage.

Got a sloping Shire block? Send us a few photos and we will tell you what is possible.

Walls we build

Retaining walls for Shire homes.

We recommend the wall that suits your soil, slope, budget and the look you want.

01

Concrete Sleeper Walls

Durable and cost-effective, with galvanised posts concreted into proper footings.

02

Sandstone Walls

Natural sandstone blocks for feature walls, terraces and waterfront landscaping.

03

Gabion Walls

Rock-filled baskets that drain freely and suit steep or wet sites.

04

Engineered Walls

Reinforced concrete and block walls for tall walls, driveways and boundaries.

05

Garden & Terrace Walls

Low walls that create level lawns, garden beds and outdoor living space.

06

Repairs & Rebuilds

Failing walls fixed or replaced with drainage and footings done properly.

Recent work

Walls we build.

A selection of recent Sutherland Shire retaining walls across Sydney.

View all projects
Our process

From site visit to finished wall.

Every Sutherland Shire wall follows the same five steps.

Site Assessment

We inspect the wall, the ground behind it, the drainage and what sits above it, and measure the lean, cracking or movement.

Diagnosis & Engineering

We work out why it is failing and bring in a structural or geotechnical engineer where the height, load or boundary requires it.

Itemised Quote

A written quote that sets out repair or rebuild options, drainage, access, approvals and timing. No vague lump sums.

Repair or Rebuild

Our crew stabilises or replaces the wall with proper footings, ag drainage, aggregate, geotextile and weep holes.

Handover

Clean site, photos of the footings and drainage before backfill, and engineer sign-off where applicable.

Walls that suit the Shire.

Built for your soil, your slope and your council's rules, with drainage and footings done properly from the start.

Why choose METCON

Sutherland Shire retaining wall builders.

We build retaining walls across the Shire, from simple garden walls to engineered walls on steep waterfront sites.

Drainage First

Every wall we build or repair gets ag drainage, clean aggregate, geotextile and weep holes. Water is what breaks walls.

Engineered Where It Matters

Walls over about a metre, on boundaries or holding up driveways are designed by an engineer to AS 4678.

Licensed & Insured

Builder Licence 384697C, $20M public liability and workers compensation on every site.

Approvals Handled

We check council rules, prepare the paperwork and lodge the CDC or DA when a wall needs one.

All Wall Types

Concrete sleeper, timber, sandstone, gabion, block and reinforced concrete. We recommend what suits the site, not what we prefer to sell.

40+ Years Experience

Family builders on Sydney sites since the 1970s, including steep blocks other builders walk away from.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

I called three builders and METCON were the only ones who actually came to look at the site before quoting. Honest pricing, no surprises.
LCLisa Chen Randwick
Two-tier sleeper wall on a steep slope. Other builders said it was too hard. METCON got it done, engineered and council-approved.
GPGeorge Papadopoulos Epping
Timber retaining wall for our backyard garden beds. Neat, well-drained, and exactly what we asked for. The crew cleaned up every day before they left.
RNRachel Nguyen Coogee
Retaining Walls Sutherland Shire FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

Do I need council approval for this wall?

It depends on the height and location. As a general guide in NSW:

Under 600mmUsually exempt, no approval required.
600mm to 900mmMay need a CDC or DA, depending on your council.
Over 900mmAlmost always a DA, engineering drawings and possibly a geotechnical report.

We check your council's rules and handle the application for you.

Do I need drainage behind the wall?

In almost every case, yes. Poor drainage is the number one cause of retaining wall failure. We install ag-drainage, gravel backfill and weep holes as standard on every wall.

Can you build on a steep or hard-to-access block?

Yes. Steep sites are a large part of what we do. We use compact machinery, staged excavation and engineered designs, and plan access for spoil removal and materials before we start.

How long does it take to build?

A standard residential wall typically takes 3 to 10 working days, depending on length, height, access and whether excavation or engineering is involved. Walls that need council approval can add 4 to 8 weeks for the approval process.

Other wall types

Compare other walls.

Not sure this is the right wall for your site? Compare the other systems we build, or ask the builder.

Back to Retaining Walls
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

Where we work

Retaining walls across the Sutherland Shire.

We build and repair retaining walls in every Shire suburb, from Cronulla and Caringbah to Menai, Engadine and Heathcote.

CronullaCaringbahMirandaSutherlandEngadineMenaiIllawongBangorKirraweeGymeaGymea BayJannaliComoOyster BayKareelaSylvaniaSylvania WatersTaren PointWooloowareBurraneerDolans BayLilli PilliYowie BayKurnellLoftusHeathcote+ Greater Sydney
Let's get started

Tell us about your block.

Your suburb, a few photos of the slope and roughly how long and high the wall needs to be is enough to start.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote